StackData Open the app

Dataset

  1. Browse
  2. World Bank Indicators
  3. Time required to deal with construction permits (days)

Time required to deal with construction permits (days)

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.

wb-indicators:IC.FRM.TIME

Time required to deal with construction permits (days)

World Bank

Publisher
World Bank
Source
World Bank Indicators (wb-indicators)
Status
Active
Formats
JSON
Licence
CC-BY-4.0 — World Bank Terms — CC BY 4.0 (Indicators API) · open
Standard
WB API v2
Dataset id
wb-indicators:IC.FRM.TIME
Last verified
2026-08-16