StackData Open the app

Dataset

  1. Browse
  2. World Bank Indicators
  3. Dealing with construction permits: Time (days)

Dealing with construction permits: Time (days)

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.

wb-indicators:IC.CNST.PRMT.TM.DY

Dealing with construction permits: Time (days)

World Bank

Publisher
World Bank
Source
World Bank Indicators (wb-indicators)
Status
Active
Formats
JSON
Licence
CC-BY-4.0 — World Bank Terms — CC BY 4.0 (Indicators API) · open
Standard
WB API v2
Dataset id
wb-indicators:IC.CNST.PRMT.TM.DY
Last verified
2026-08-16