StackData Open the app

Dataset

  1. Browse
  2. World Bank Indicators
  3. Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)

Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.

wb-indicators:IC.CNST.PRMT.QCBC.XD.01.DB1619

Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)

World Bank

Publisher
World Bank
Source
World Bank Indicators (wb-indicators)
Status
Active
Formats
JSON
Licence
CC-BY-4.0 — World Bank Terms — CC BY 4.0 (Indicators API) · open
Standard
WB API v2
Dataset id
wb-indicators:IC.CNST.PRMT.QCBC.XD.01.DB1619
Last verified
2026-08-16